The issues subject to a shopping center in Hangzhou central air-conditioning system design. First established in Hangzhou, the meteorological conditions and the construction of the structure, then the data collection, again requirement of the building chills, heat air conditioning system design load calculation; on the building facades, internal walls, windows transient temperature caused by the cooling load on a case-by-calculation.
Lighting system cooling, the human body caused by the heat load by cold calculation. In view rooms within the overall layout and the use of using The fresh new wind semi-centralized air-conditioning system. Each of the new rooms End wind load calculation after the greatest moment of the load data. Based on the total cooling load for air-conditioning equipment selection. Chassis selection of new wind, the type of fan-coil system, water system design. Refrigeration units using water-cooled system, the cold water pumps for selection. The air supply pipe size, in accordance with the selection of Outdoor Air pipeline size, the complete piping system design; Finally drawing the corresponding engineering drawings.