ABSTRACT
Haiyan Shuanghong Textile and Crafts Ltd is the manufacturer of wood model boats. With the expansion of the factory, the distance of productions is increased continuously. In the space arrangement is loose, and not compact enough, each department of the cross between logistics routes appear, thus make detours and backflow of workshop, the costs of the productions are raise.
In this paper, through the use of facilities planning methods, the most mainstream of the SLP to analysis the production process and material flow of Haiyan Shuanghong Textile and Crafts Ltd’ workshop, and on the basis of this analysis of their logistics, workshop judge the reasonableness of the original layout, to identify the problems and optimize it by SLP.
KEYWORDS: Facilities Planning,Analysis of logistics,SLP, Production Process