Abstract
The study of this paper is the design of the warm facilities for the family in winter , it include acquiring the data that consuming calories of the room and design of the warm boiler, including use Pro/Engineer to model every parts of the boiler and fabricate the boiler, and then chose the main parts to design its craft.the warm boiler including burner、Change a hot machine、Inflate water tank 、The water pump 、Circuit board and so on, its design involves many kinds of knowledge such as material, mechanics, Several business trips ,provide warm and so on. Some times ago,the design of warm boiler was finished mostly by manual,the time of design was long and the design efficiency was low,but along with fast development of the computer and information, Computer Aided Design and Computer Aided Manufacturing (CAD/CAM) is been widely used in all areas.According to the general design steps of warm boiler and the result of design,my design can shorten largely the design of warm boiler,reduce cost,improve design efficiency and product quality,and make the design more scientific by using Pro/Engineer soft.
Keywords Burner Change a hot machine Inflate water tank technological design Modeling with Pro/Engineer