This graduation design is to set of spare parts of the process planning and processes the special fixture design. This part is the executing agency for the help of the major components. It is one of the end of the hydraulic help with the component connection, the middle of a vast and round and up to the end of the supporting role.
This passage include of four chapters, the first chapter carried out a detailed process analysis; second chapter introduces the components of the preparation process planning, including process routes and process design; third chapter on some special fixture design process methods and steps described in detail; the fourth chapter of the graduate design summed up the overall design process.
KEY WORD: Outer tube bushing, Process planning , Process analysis, The special fixture,Sum