How to control in advance the supervision of construction project on the scene effectively
- The Jiangnan Residence Section H project
Student: Supervisor:
Abstracts
To control in advance is one of the important means to supervise and manage the construction project , will have a bearing on the quality and efficiency of supervision work. To control well before the event often gets twofold results with half the effort. In the entire proceeding and on every side of project inspection, to control forehand is a key link, by taking efficient precautions in advance, we might avoid inappropriate construction behavior to the utmost limit, it will be advantageous to produce the maximum of investment returns in the construction engineering.
Based on the practice and summary of direct inspection work of the Jiangnan Residence Section H project, this thesis first inquire into the importance of the program of supervision planning and supervision’s detailed rules and regulations to control before the event. The engineering quality is the life of construction engineering, is the fountain of development of enterprises, is the most important factor of supervision work. Second, this dissertation dwell upon the important influence of control before the event in the engineering supervision on engineering quality. Finally the author expound briefly such problems on control forehand as controlling the engineering progress、controlling the cost of construction and the coordinating ability of supervision work etc, the control engineering etc. ,and put forward her own new ideas.
Keyword: project supervision control in advance supervision planning quality control