ABSTRACT
In the manufacturing industry, due to the restrictions of complex condition, such as equipment, delivery time and the manufacturing process and so on, it is much more difficult to have change on enterprise restriction. some ill Facility Layout will increase the material transit cost, invalid production and mass cost in restriction .Thus ,enterprise facility layout has become one of the most important problem. This paper has analyzed and researched on optimization of company facility according to facilities planning theory.
Shenying kitchen factory is a manufacturing which concluds professional designing, production, sales of kitchen tools. As with many private enterprises, in the market competition, the company's management and production reveales many problems. According to the actual conditions and demand of the enterprise, together with the pre-observation and preliminary analysis of the logistics activities,using the SLP method which is the mainstream method in Logistics System Analysis and Facility Plan to analyse its production process of logistics. I decided to keep the original area,through the re-layout of the facilities of the factory floor to improve the production logistics of the factory.
KEYWORDS:Facilities Planning, Logistics Analysis,SLP (Systematic Layout Planning)