Ãâ·Ñ»ñÈ¡|
ÂÛÎÄÌìÏÂÍø
  • ÂÛÎÄÌìÏÂÍø |
  • Ô­´´±ÏÒµÂÛÎÄ |
  • ÂÛÎÄ·¶ÎÄ |
  • ÂÛÎÄÏÂÔØ |
  • ¼ÆËã»úÂÛÎÄ |
  • ÂÛÎĽµÖØ |
  • ÂÛÎÄÅŰæ |
  • ÍâÎÄ·­Òë |
  • Ãâ·ÑÂÛÎÄ |
  • ¿ªÌⱨ¸æ |
  • ÐĵÃÌå»á |

µ±Ç°Î»ÖãºÂÛÎÄÌìÏÂÍø -> ÂÛÎÄ·¶ÎÄ -> ÍÁľ¹¤³Ì

ijÁù²ãÉÌסլ¿ò¼ÜÉè¼Æ

±¾ÎÄID£º15769 ×ÖÊý:12429,Ò³Êý:77

ÏÂÔØµØÖ· È«ÎÄÏÂÔØÁ´½Ó(³äÖµ:£¤168.00Ôª) 

ÂÛÎıàºÅ:TM093   ÂÛÎÄ×ÖÊý:12429,Ò³Êý:77  ¸½ÈÎÎñÊ飬¿ªÌⱨ¸æ£¬ÎÄÏ××ÛÊö£¬ÍâÎÄ·­Ò룬CADͼ

Õª  Òª£º ±¾Éè¼ÆÊÇÉÌסèì¼Ü¹¤³Ì½á¹¹Éè¼Æ£¬Î»ÓÚÕã½­¡£ÉÌÒµ²¿·Ö4544.7©O£¬×¡Õ¬²¿·Ö4055.7 ©O£¬µ×²ãÕ¼µØÃæ»ýԼΪ785©O£¬×ܸßΪ19.6m£¬Êô¶à²ã½¨Öþ¡£µØÕðÉè·ÀÁÒ¶ÈΪÁù¶È£¬¿¹ÕðµÈ¼¶ÎªËļ¶£»½¨Öþ½á¹¹°²È«µÈ¼¶¶þ¼¶£¬Éè¼ÆÊ¹ÓÃÄêÏÞΪ50Ä꣬Éè¼ÆÖв»¿¼ÂÇ¿¹Õð¼ÆËã¡£±¾·½°¸²ÉÓøֽî»ìÄýÍÁÏÖ½½èì¼Ü½á¹¹£¬Ö÷Ìå½á¹¹ÎªË«Ïò³ÐÖØèì¼Ü¡£ÔÚ½øÐкÉÔØ¼ÆËãºÍ¹¹¼þ½ØÃæ¹ÀËãºó£¬Ñ¡È¡Ò»é¯èì¼Ü½øÐмÆË㣬Ó÷ֲ㷨Ëã³öÄÚÁ¦£¬²¢¶Ô×î²»ÀûºÉÔØ×éºÏ½øÐзÖÎö£¬Í¨¹ýDÖµ·¨Çó³ö·çºÉÔØ£¬½ø¶ø½øÐÐèì¼ÜÁºÖù½ØÃæÉè¼Æ¡£²¢Ñ¡È¡²¿·ÖÂ¥Ãæ°å¡¢Â¥ÌÝ¡¢¶ÀÁ¢»ù´¡¡¢µØÁº½øÐÐÉè¼Æ¡£±¾·½°¸»ù´¡ÐÎʽ²ÉÓöÀÁ¢»ù´¡£¬Â¥ÌÝΪ¸Ö½î»ìÄýÍÁÏÖ½½°åʽ¥ÌÝ¡£Õû¸ö·½°¸Éè¼Æ»ù±¾·ûºÏÉè¼ÆºÍ½á¹¹ÒªÇó
¹Ø¼ü´Ê£º¸Ö½î»ìÄýÍÁ  ½á¹¹Éè¼Æ  ºÉÔØ¼ÆËã ÄÚÁ¦×éºÏ ¶ÀÁ¢»ù´¡

 A six-story commercial framework for project design 4
Abstract: This design is the business-living building, located in Zhejiang. The business construction area of about 4544.7©O, the living construction area of about 4055.7©Oand bottom covers about 785©O, the total high is 19.6 m, is a multi-storey building. The earthquake intensity is six degrees to setup defences, the forth grade antidetonation, Structural safety grade two and the design life span of 50 years. The Design did not consider seismic calculations. The program used cast-in-place reinforced concrete frame structure, the main load-bearing structure of the two-way framework. Conducting load calculation and after estimating beam, select a framework for load calculations, using layered calculated forces, later analysis the most unfavorable load portfolio ,through D value derived wind load, and then cross-section beams framework for the design. And select some floor panels, staircases, the independent foundation and footing beam design. This basic form is pile, the stair is the stair of cast-in-place modes in Chinese operatic music of armored concrete . The whole conceptual design accords with the design
.
Keywords:  Reinforced Concrete   Structural design  Load calculation  
Combination of internal forces  Independent Foundation

Ä¿   ¼
Ä¿   ¼ 1
Õª  Òª 1
Abstract 2
1 Ð÷ÂÛ 3
1.1 ¹¤³Ì±³¾° 3
1.2 ¹¤³ÌÌØµã 4
2 èì¼Ü½á¹¹Éè¼Æ 5
2.1 ¹¤³Ì¸Å¿ö 5
2.2½á¹¹Æ½Ãæ²¼Öü°¼ÆËã¼òͼ 7
2.3Â¥°å¼ÆËã 11
2.4.èì¼ÜÄÚÁ¦¼ÆËã 13
2.5ÄÚÁ¦×éºÏ 54
2.5èì¼ÜÖùÁºÅä½î 55
3Â¥ÌÝÉè¼Æ 57
3.1Éè¼Æ×ÊÁÏ 57
3.2µ×²ãÂ¥ÌÝÉè¼Æ 58
3.3¶þ¡¢Èý²ãÂ¥ÌÝÉè¼Æ 61
3.4ËIJãÂ¥ÌÝÉè¼Æ 64
4.»ù´¡Éè¼Æ 68
4£®1µØ»ù³ÐÔØÁ¦ÐÞÕýÖµ 68
4£®2µØ»ù³ÐÔØÁ¦¼ÆËã 68
4£®3µØÁºÉè¼Æ 74
Ö     л 75
²Î¿¼ÎÄÏ× 76
¸½  ¼ 77

Ïà¹ØÂÛÎÄ
ÉÏһƪ£ºË«·ÉÖÐѧ½Ìѧ¥½á¹¹Éè¼Æ ÏÂһƪ£ºº¼ÖÝÊÐÓÀΰ¾­¼ÃÔ°Çø¿ò¼Ü¹¤³Ì½á¹¹..
ÍÆ¼öÂÛÎÄ ±¾×¨Òµ×îÐÂÂÛÎÄ
Tags£º×¡Õ¬ ¿ò¼Ü Éè¼Æ 2011-03-28 18:50:34¡¾·µ»Ø¶¥²¿¡¿

Ïà¹ØÀ¸Ä¿

×Ô¶¯»¯×¨Òµ
µç×Ó»úµçÀà
²â¿Ø¼¼Êõ
»úеģ¾ßÉè¼Æ
½ðÈÚרҵ
µç×ÓͨÐÅ
½»Í¨¹¤³Ìרҵ
Ó¢Óïרҵ
»á¼Æ×¨Òµ
ÕþÖÎѧÐÐÕþѧ
²ÆÎñ¹ÜÀí
¹ú¼ÊóÒ×
·¨ÂÉרҵ
Éç»á¹¤×÷רҵ
ÎïÁ÷ÂÛÎÄ
ÈËÁ¦×ÊÔ´
ʳƷ¿ÆÑ§ÉúÎï¼¼Êõ
Êг¡ÓªÏú
ÍÁľ¹¤³Ì
»¯Ñ§¹¤³ÌÓ빤ÒÕ
ÂÃÓιÜÀíרҵ
¹¤É̹ÜÀí
¹¤³Ì¹ÜÀí
ÆäËûרҵÂÛÎÄ


¹ØÓÚÎÒÃÇ | ÁªÏµ·½Ê½ | ÂÛÎÄ˵Ã÷ | ÍøÕ¾µØÍ¼ | Ãâ·Ñ»ñÈ¡ | ×êʯ»áÔ± | Ô­´´±ÏÒµÂÛÎÄ

 

ÂÛÎÄÌìÏÂÍøÌṩÂÛÎļì²â,ÂÛÎĽµÖØ,ÂÛÎÄ·¶ÎÄ,ÂÛÎÄÅŰæ,ÍøÕ¾ÓÀ¾ÃÓòÃûWWW.GEPUW.NET

±¾Õ¾²¿·ÖÎÄÕÂÀ´×ÔÍøÓÑͶ¸åÉÏ´«£¬Èç·¢ÏÖÇÖ·¸ÁËÄúµÄ°æÈ¨£¬ÇëÁªÏµÖ¸³ö£¬±¾Õ¾¼°Ê±È·Èϲ¢É¾³ý  E-mail: 893628136@qq.com

Copyright@ 2009-2022 GEPUW.NET ÂÛÎÄÌìÏÂÍø °æÈ¨ËùÓÐ