ABSTRACT
Hydrack gas drilling rig is the first for the electro-hydraulic drilling rig, the rig before most of the air-powered. Drill pipe and bit by a hydraulic motor through the rotating six-speed gear box; to be thrust into power and the trip from 815 mm to achieve the hydraulic cylinders, with rack and pinion system to process will be carried out twice. About the most torque 949 Nm, a way to about 1702 mm bit on the effective thrust of about 2,794 kg. Diameter drill pipe design for the 60.3 mm, for the 1524 mm long with a cone-shaped male connector, commonly known as EF / N-type drill pipe.
1963, the design of the micro-Hydrack rig. This is a very short period of Qinger drilling rig, his trip to 851 mm. A three-speed gear box, the largest of its torque to 691 Nm, effective drilling thrust 2,145 kg. Design drill pipe smaller diameter of 41.3 mm, length of 762 mm, also with cone-shaped male connector, called ET / A-type drill pipe. ET / A-type and the initial ET / N-type drill pipe is the drainage of two standard gas drilling equipment, including in the United Kingdom is now No. 613/1974 of the Ministry of Coal samples.
Hydrack drilling rig is installed by the group composed of standard parts;
Drill - a rack with skateboards, skateboards support. Bit installed in the sliding seat, by the hydraulic motors, Biansuchilun me and thrust as well as sets of component supply rotary joint. On the rack, slide under the hydraulic cylinder. Bored end of the rack-oriented holder used to support the drill pipe and fixed.
Power equipment - which is equipped with a hydraulic oil tank, following a slip-ski, makes it easy to transport. A motor and hydraulic pump and other auxiliary equipment, such as the return to the oil filter, safety valve, and pumps, tank airway and humidity safety switches are installed in the fuel tank above.
Control panel - the smallest of the four devices. Bored functions include the control valve, pressure gauge and the instructions of torque on the drilling bit pressure.
Rack assembly - when the preparations for drilling, rack supports drilling rig. Rack to adapt to a variety of different forms of drilling terrain changes, H-rack, A-frame and single-bearing pillars. The latter two are based drilling rig users to the requirements of the design.
Hydraulic oil through hydraulic flexible hose from the power plant station transmitted to the control panel and then into the rig. General long hose 4 m, to adapt to the positioning devices.
Keyword: Power equipment Control panel Rack assembly